Harmony Dela Cruz #25644
FORMSTACKDocs uploadedOver 72hForm receivedNo reply · oldSales date
Unknown — not on Formstack
Sales date is not on the cancellation form
Cancel date
Mar 2, 2026
Formstack submitted (America/New_York)
Reason for cancel
Other
Township changed how far back the building needs to be on our property, therefore will result in denying the permit with where we were planning to place the structure. We were told the setback would have to be 12.5’. Upon submitting the permit application, it was found that we would need to be 24.4’ into the yard which is just too far back for the size of the structure and our yard.
Request: Credit On File
Permit proof
What we decided
HISTORY · never an input to decide()Staff replied but not a decision letter
What the app recommends
Policy engine decide()Need documents
70% mediumOpen the uploaded file — a filename is not a government-signed denial
Open the uploaded file; a filename is not a denial. An attached file (including names like denial.pdf) is not a government-signed unfixable permit denial until a person has opened the actual file and confirmed it is official. Stay need_docs until reviewed.
From order-form rules + opened permit file. Independent of Jacob's sent mail.
Jacob has not sent a recorded decision yet. Policy proposal is ready for Agree / Override / Escalate.
Manufacturer
—
Sales rep —
Order total
—
Deposit
—
Manufacturer, deposit, order total, and signed order form stay empty until a live read-only order-app pull. Unknown money shows —.
Gmail related to #25644
READ ONLY · never sent from this labcancellations@ threads matched by order number, then customer email. One cancellation case per order.
- Inbound
Re: Denial for #25644
Apr 28, 2026, 6:27 PM · harmony528@gmail.com · 4 messages
I was told you need the denied permit, I sent that. Now you need more documents. Will a letter from the town suffice? On Tue, Apr 28, 2026 at 5:50 PM Cancellati
- InboundApr 21, 2026, 11:55 PM · harmony528@gmail.com
Good evening, I had previously sent a copy of my zoning permit application over to cancel my order and receive a refund
- StaffApr 28, 2026, 5:49 PM · cancellations@bigbuildingsdirect.com
Good afternoon Harmony, We have received your denial. To approve your request we will need a survey or document that sho
- InboundApr 28, 2026, 6:27 PM · harmony528@gmail.com
I was told you need the denied permit, I sent that. Now you need more documents. Will a letter from the town suffice? On
- Inbound
Re: Your cancellation form #25644
Mar 6, 2026, 8:41 PM · harmony528@gmail.com · 5 messages
Is this where you stop responding? I emailed you on 3/2/26, you finally responded on 3/5/26 at the end of a business day. I respond and have not heard anything
- InboundMar 2, 2026, 6:36 PM · harmony528@gmail.com
I cannot send a zip file from my phone, the area to upload went black with nothing to click. I submitted my order cancel
- StaffMar 5, 2026, 5:47 PM · cancellations@bigbuildingsdirect.com
Good afternoon Harmony, We have reviewed the attached documents; however, this request falls outside of our cancellation
- InboundMar 6, 2026, 2:59 AM · harmony528@gmail.com
Ok, so then when I have them deny the application due to them telling me the wrong setbacks from the start, will I be re
- Jacob / staff sent
Cancellation Form
Mar 2, 2026, 6:30 PM · noreply@formstack.com
Formstack Cancellation Form · order 25644 · Harmony dela Cruz
- Jacob / staff sent
Your cancellation form
Feb 19, 2026, 5:29 PM · cancellations@bigbuildingsdirect.com
Hello, We are sending over a link to your cancellation form. Please be sure to fill out all required fields in order to properly submit the form. If your cancel
Formstack form
Original payloadEvery field from the Cancellation Form. Policy proposal still uses order-form rules plus an opened file — Jacob's sent email is comparison only.
- Building order number
- 25644
- Name
- Harmony dela Cruz
- Phone
- (732) 978-2181
- harmony528@gmail.com
- Reason (dropdown)
- Other
- Reason (free text)
- Township changed how far back the building needs to be on our property, therefore will result in denying the permit with where we were planning to place the structure. We were told the setback would have to be 12.5’. Upon submitting the permit application, it was found that we would need to be 24.4’ into the yard which is just too far back for the size of the structure and our yard.
- Request (refund vs credit)
- Credit On File
- Credit checkbox
- I understand
- Submitted time
- 03/02/26 6:30 PM · form Mar 02, 2026 06:20 PM
- Doc names
- uc, 120399912_uc.bin, 120399912_img_6861.png
- Local files
- None on disk
- Drive / doc URLs
- uc — https://drive.google.com/a/bigbuildingsdirect.com/uc?id=1Qy3G8g4TLhDPzkGnUWAqf-8f5LNUADzF&export=download&size=478195&display=/httpss3.amazonaws.comuseast1prodformssubmissionuploads10407244677128120399912aaa699038c64449384e009ed145dec46120399912_img_6861.png_120399912_img_6861.pngTEST MODE
- 120399912_uc.bin — https://drive.google.com/a/bigbuildingsdirect.com/uc?id=1Qy3G8g4TLhDPzkGnUWAqf-8f5LNUADzF&export=downloadTEST MODE
Attachments
0 local · 2 Drive link-only · order #25644Local files are served from data/formstack-docs/25644/ in TEST MODE. A signature is not a denial letter. Filenames never set government-signed.
Drive links (no local file)
- ucTEST MODE · link-only
- 120399912_uc.binTEST MODE · link-only
Facts
Imported from Formstack Cancellation Form (thread 19cb039100f62f4e). Submitted 03/02/26 6:30 PM ET. Request: Credit On File. Credit checkbox: I understand. Docs mentioned: uc, 120399912_uc.bin, 120399912_img_6861.png. Signing date of the original order is unknown — lab does not auto-refund on 72h. TEST MODE, email NOT SENT.
Permit notes: Permit/supporting docs attached on Formstack (filenames only — not opened): uc, 120399912_uc.bin, 120399912_img_6861.png. A filename is not a denial. Township changed how far back the building needs to be on our property, therefore will result in denying the permit with where we were planning to place the structure. We were told the setback would have to be 12.5’. Upon submitting the permit application, it was found that we would need to be 24.4’ into the yard which is just too far back for the
- Signed contract
- Yes
- Signed at
- Unknown (need dates)
- Cancel requested
- 2026-03-02T18:30:27-05:00
- Hours since signing
- n/a
- Days since signing
- n/a
- Habitable
- No
- Wants refund
- No
- Permit denial alleged
- Yes
- Permit file uploaded
- Yes (uc, 120399912_uc.bin, 120399912_img_6861.png)
- File opened in lab
- No
- Government-signed denial
- No
- Unfixable
- No
- Engineered plans required
- No
- Engineered plans purchased
- No
- Variance required
- No
- Setbacks can be met
- Unknown
- Punch list
- No
- Vendor fail
- No
- Process error
- No
- Legal / BBB / AG / chargeback
- No
- Missing reason
- No
- Credit offered / completed
- no / no
- Refused credit checkbox
- No
Permit doc review
TEST MODE. Open the actual uploaded file. A filename is not a denial. Saving writes data/store.json only — never email, never live cancel-app. Bulk file-open reviews from data/permit-doc-reviews.json hydrate here when that file exists; they never set government-signed from a filename.
Filenames
uc
No local file — use the Attachments Drive link (TEST MODE)
120399912_uc.bin
No local file — use the Attachments Drive link (TEST MODE)
120399912_img_6861.png
No local file — use the Attachments Drive link (TEST MODE)
Status: Not opened
Reviewer: Brandyn Wnukowski
Manager check
One-click Agree is the future “manager checks the bot’s work” action. These buttons only write local test-decision records. They do not send email and they do not move money.
Override (with note)
Draft customer email
NOT SENTSubject: Cancellation request — additional documents needed
Hello Harmony Dela Cruz, To proceed with a refund under the permit-denial policy we need a copy of the permit denial or written confirmation from your building department. A plot plan alone is not enough. Our management team typically requires written confirmation from the building department — even a forwarded email stating the lot cannot take the building. Please reply to this email with that document attached. Review takes 1–2 weeks after we have what we need. Big Buildings Direct Cancellation Department Email Only: cancellations@bigbuildingsdirect.com 1515 N Marion St Tampa, FL 33602
