Big Buildings Direct

Cancellation Lab

Test only

TEST MODE — never sends email

← Historical review

Kristen Keller #23012

FORMSTACKNeeds reviewOver 72hForm received

Sales date

Unknown — not on Formstack

Sales date is not on the cancellation form

Cancel date

Mar 2, 2026

Formstack submitted (America/New_York)

Reason for cancel

Other

After a long process of getting through zoning then onto the building department. i had too physically drive there to see what was holding us up there. After looking through the paper work she found our permit. it was submitted to the building official for review. after his review he deemed it necessary that we provide full blown architectural drawings with the generic engineered drawings. at this point we contacted firms to see when and how much cost this added to the project. after receiving the information on what they were requiring and the extent it was entailing. plumbing electrical hvac engineering as well. after we looked at the extreme additional cost to the project. and with out this this we could not get an approval to build. we found the cost associated to get building approval was more than the building was going to cost to buy. thank you for your consideration in our refund.

Request: Credit On File

Permit proof

No denial letter on file.

What we decided

HISTORY · never an input to decide()

Credit on file· outside_policy_default_credit

Sent credit-on-file letter. Sent mail to kkeller@rightway.com: Good afternoon Kristen, We have reviewed your request. Due to the amount of time that the project has been on order it does fall outside of our cancellation policy. If you wish to proceed with the

2026-03-17T21:51:00Z · from cancellations@bigbuildingsdirect.com

Jacob / staff sent historically. Display only — not the policy proposal and not fed into decide().

Actual sent email (already sent historically)

From: cancellations@bigbuildingsdirect.comTo: kkeller@rightway.com

Subject: Re: Credit

Good afternoon Kristen, We have reviewed your request. Due to the amount of time that the project has been on order it does fall outside of our cancellation policy. If you wish to proceed with the

Snippet only — full body not yet loaded for this thread.

What the app recommends

Policy engine decide()

Need documents

70% medium

Permit denial alleged but no government-signed letter / building-dept email

A plot plan or customer narrative is not enough. Need a denial signed by a state/local/federal official, or a forwarded email from the building department. Do not refund yet.

From order-form rules + opened permit file. Independent of Jacob's sent mail.

MISMATCH

Jacob sent: credit_on_file. Policy proposal: need_docs (need_government_signed_denial).

Manufacturer

Sales rep —

Order total

Deposit

Manufacturer, deposit, order total, and signed order form stay empty until a live read-only order-app pull. Unknown money shows —.

Gmail related to #23012

READ ONLY · never sent from this lab

cancellations@ threads matched by order number, then customer email. One cancellation case per order.

  • RE: Credit

    Mar 18, 2026, 9:32 AM · kkeller@rightway.com · 5 messages

    Inbound

    The duration of the project was out of our hands. And by the time we got zoning approval. It was to late in the season to start the project. Then with building

    1. InboundFeb 27, 2026, 2:13 PM · kkeller@rightway.com

      We are looking for a refund for the amount returned in its original form of payment. If I read this correctly its a cred

    2. StaffMar 2, 2026, 5:58 PM · cancellations@bigbuildingsdirect.com

      Good afternoon Kristen, If the cancellation falls outside our policy, the deposit will convert to a credit on file, usab

    3. InboundMar 16, 2026, 3:47 PM · kkeller@rightway.com

      Just circling back on this. Thank you Sent from my Galaxy -------- Original message -------- From: Cancellations Departm

  • Cancellation Form

    Mar 2, 2026, 6:30 PM · noreply@formstack.com · 5 messages

    Jacob / staff sent

    Formstack Submission For: Cancellation Form Submitted at 03/02/26 6:30 PM Cancellation Policy: The Cancellation Policy is made and entered into effective as the

    1. StaffMar 2, 2026, 3:24 PM · noreply@formstack.com

      Formstack Submission For: Cancellation Form Submitted at 03/02/26 3:24 PM Cancellation Policy: The Cancellation Policy i

    2. StaffMar 2, 2026, 3:24 PM · noreply@formstack.com

      Formstack Submission For: Cancellation Form Submitted at 03/02/26 3:24 PM Cancellation Policy: The Cancellation Policy i

    3. StaffMar 2, 2026, 6:13 PM · noreply@formstack.com

      Formstack Submission For: Cancellation Form Submitted at 03/02/26 6:13 PM Cancellation Policy: The Cancellation Policy i

  • Your cancellation form

    Feb 27, 2026, 1:47 PM · cancellations@bigbuildingsdirect.com

    Jacob / staff sent

    Hello, We are sending over a link to your cancellation form. Please be sure to fill out all required fields in order to properly submit the form. If your cancel

Formstack form

Original payload

Every field from the Cancellation Form. Policy proposal still uses order-form rules plus an opened file — Jacob's sent email is comparison only.

Building order number
23012
Name
kristen keller
Phone
(989) 714-3388
Email
kkeller@rightway.com
Reason (dropdown)
Other
Reason (free text)
After a long process of getting through zoning then onto the building department. i had too physically drive there to see what was holding us up there. After looking through the paper work she found our permit. it was submitted to the building official for review. after his review he deemed it necessary that we provide full blown architectural drawings with the generic engineered drawings. at this point we contacted firms to see when and how much cost this added to the project. after receiving the information on what they were requiring and the extent it was entailing. plumbing electrical hvac engineering as well. after we looked at the extreme additional cost to the project. and with out this this we could not get an approval to build. we found the cost associated to get building approval was more than the building was going to cost to buy. thank you for your consideration in our refund.
Request (refund vs credit)
Credit On File
Credit checkbox
I understand
Submitted time
03/02/26 7:16 PM · form Mar 02, 2026 06:55 PM
Doc names
None
Local files
None on disk
Drive / doc URLs
None on the form

Attachments

0 local · 0 Drive link-only · order #23012

Local files are served from data/formstack-docs/23012/ in TEST MODE. A signature is not a denial letter. Filenames never set government-signed.

No local files and no Drive URLs on this form.

Facts

Imported from Formstack Cancellation Form (thread 19cb039100f62f4e). Submitted 03/02/26 7:16 PM ET. Request: Credit On File. Credit checkbox: I understand. No permit docs on the form. Signing date of the original order is unknown — lab does not auto-refund on 72h. TEST MODE, email NOT SENT.

Permit notes: After a long process of getting through zoning then onto the building department. i had too physically drive there to see what was holding us up there. After looking through the paper work she found our permit. it was submitted to the building official for review. after his review he deemed it necessary that we provide full blown architectural drawings with the generic engineered drawings. at this point we contacted firms to see when and how much cost this added to the project. after receiving

Signed contract
Yes
Signed at
Unknown (need dates)
Cancel requested
2026-03-02T19:16:53-05:00
Hours since signing
n/a
Days since signing
n/a
Habitable
No
Wants refund
Yes
Permit denial alleged
Yes
Permit file uploaded
No
File opened in lab
No
Government-signed denial
No
Unfixable
No
Engineered plans required
No
Engineered plans purchased
No
Variance required
No
Setbacks can be met
Unknown
Punch list
No
Vendor fail
No
Process error
No
Legal / BBB / AG / chargeback
No
Missing reason
No
Credit offered / completed
no / no
Refused credit checkbox
No

Permit doc review

TEST MODE. Open the actual uploaded file. A filename is not a denial. Saving writes data/store.json only — never email, never live cancel-app. Bulk file-open reviews from data/permit-doc-reviews.json hydrate here when that file exists; they never set government-signed from a filename.

Filenames

No file uploaded on the Formstack form.

Status: Not opened

Reviewer: Brandyn Wnukowski

Manager check

One-click Agree is the future “manager checks the bot’s work” action. These buttons only write local test-decision records. They do not send email and they do not move money.

Override (with note)

Draft customer email

NOT SENT

Subject: Cancellation request — additional documents needed

Hello Kristen Keller,

To proceed with a refund under the permit-denial policy we need a copy of the permit denial or written confirmation from your building department. A plot plan alone is not enough.

Our management team typically requires written confirmation from the building department — even a forwarded email stating the lot cannot take the building.

Please reply to this email with that document attached. Review takes 1–2 weeks after we have what we need.

Big Buildings Direct
Cancellation Department
Email Only: cancellations@bigbuildingsdirect.com
1515 N Marion St
Tampa, FL 33602